WWTP Expansion to 2.25 MGD

/
/
WWTP Expansion to 2.25 MGD

WWTP Expansion to 2.25 MGD

Owner

City of Aubrey

Estimated Completion Date

Completion Date

790 calendar days

Scope

This project includes improvements at the City of Aubrey Wastewater Treatment Plant to increase the design capacity to from 0.4 to 2.25 MGD. Treatment improvements include of two screening channels each with a Fine Screen and Washer Compactor, Influent Lift Station with five submersible pumps, one Vortex Grit Removal system, two Aeration Basins with three multistage centrifugal blowers, two circular Secondary Clarifiers with three return activated sludge (RAS) and two waste activated sludge (WAS) pumps, two cloth-media Filters, coagulant and hypochlorite storage and dosing equipment, UV Disinfection system with two channels, plant water system, plant drain system, yard piping, Sludge Storage Tank with two positive displacement blowers, two dewatering Screw Presses and emergency Generator. Building improvements include an O&M Building, two Electrical Buildings, a Chemical Building and a Dewatering Building. A more detailed description of the work is included in Section 01 11 00, Summary of Work.

Contract Price

$45,000,000.00