Construction of a 25 mgd treated water pump station, two 5 million gallon Type III groundwater storage tanks, a hydropneumatic surge tank system, external emergency generators, and related piping, valves, vaults, drainage, access roadways, and site civil works. The existing booster station will remain in service and be protected during the construction of the permanent pump station.