This project consisted of furnishing and installation of additional plate settlers in the existing sedimentation basins, installation of new underdrains, media, troughs, piping, valves, instruments and appurtenances for filter No. 5, installation of new membrane feed pump, replacement of existing raw water flow meter and control valve with new flow meter and valve.