Duck Creek WWTP Filter & UV Rehab

/
/
Duck Creek WWTP Filter & UV Rehab

Duck Creek WWTP Filter & UV Rehab

Owner

City of Garland

Estimated Completion Date

Completion Date

3/1/2026

Scope

1. Replace each of six vertical centrifugal solids handling pumps with new 20 mgd flow rate capacity pumps with 125 HP motors and variable frequency drives. 2. Install new steel discharge piping, valves, and appurtenances. 3. Approximately 1750 LF of 48-inch secondary effluent fiberglass reinforced pipeline. 4. Install three 24 mgd capacity each Aquastorm disk filters in 4 concrete basins and associated equipment. 5. Install Trojan Signa UV equipment in 3 concrete channels with one future concrete channel with total disinfection capacity of 72 mgd. 6. Install new pre-cast panel building electrical building to the west of the UV Filter Structure. 7. Install three 500 gpm horizontal centrifugal plant water pumps, piping, and appurtenances on adjacent slab.

Contract Price

$35,000,000